......@@ -42,4 +42,5 @@ We do not focus on the happy flow of missions, which by design has no resource c
\item Task
\item Resource
\item Capability
\item Capability requirement \todo{use consistently}
\end{itemize}
......@@ -106,7 +106,7 @@ The same is true for the emergency room for the tasks Prepare ER and Give medica
The operator for Prepare transport and Perform rescue may very well be different, as may be the medic for Prepare ER and Give medical treatment.
In a C2 scheduling problem it must be possible to express the constraint that the same resource must be chosen for two skills \todo{Fok: een taak 'bezit' volgens mij geen skill (of beter capability) maar ik denk dat requires hier beter is: a task requires a capability....} of different tasks.
In a C2 scheduling problem it should be possible to express the constraint that the same resource must be chosen for two capability requirements of different tasks.
These constraints are called \emph{resource affinity constraints}.
Both schedules in \cref{fig:SARSchedules} have the same transport and the same emergency room selected, but the scheduler is free to select different operators and different medics.
......